Where you work — 🏬 On-site survey + 📋 Document prep (no GeoSpace screen work yet)
1. Site survey
Measure and record the following with a tape measure or laser distance meter.Checkpoint — You are done once you have the numbers written down: ”○ m wide × ○ m deep, mounting height ○ m”.
2. Decide anchor placement
Place at least four anchors at the four corners of a rectangle that surrounds the detection area.- Clustering them on one side, or placing them close to a straight line, greatly increases position error.
- Stay away from metal (steel, iron, aluminum) — the rule is simply do not mount directly onto metal shelving, steel columns or refrigeration units. Use an arm’s length (about 50 cm) between the anchor and the metal as your rule of thumb.
- For each mounting point, check where the nearest power outlet is. Whether the power cable (3 m recommended) reaches decides whether you can actually mount there.
Checkpoint — You are done once the floor plan (or a sketch) shows the four anchor spots plus the power route for each one.
3. What to bring
All setups
Additional items by mounting method — choose one based on site conditions.
4. Prepare the floor plan
You need a floor plan image (PNG · JPG) to upload to GeoSpace.- It must match the real layout of the space.
- A span whose measured length you know (a wall, a column, etc.) must be identifiable on the plan, otherwise you cannot set the scale.
Readiness checklist
Next steps
Step 2 · GeoSpace setup (account)
Sign in to GeoSpace and confirm your organization and license.