1) On-Site Locator Installation
- Label the front
- Read the last 4 digits of the UWB MAC address on the back label and write them on the front of the locator with masking tape.
- The back label is not visible after installation, so label before installing. The S/N and UWB MAC address on the back label are used in 5. Hardware Registration, so photograph the label before installing.
- This makes each corner’s locator easy to identify, and is used in 6. Activating Positioning to match corners to locators during plan placement.
- If the device ships with identification already attached to the front, use the existing marking.
- Mount the locators
Installation height
So that signals sent from the locators to phones below are not blocked by people or fixtures, we recommend an installation height of 3 m (if height is limited by site conditions, minimum 2 m), and align all 4 locators at the same height.
So that signals sent from the locators to phones below are not blocked by people or fixtures, we recommend an installation height of 3 m (if height is limited by site conditions, minimum 2 m), and align all 4 locators at the same height.
- Install the locators in a rectangle at the four corners of the detection area.
- There are two installation methods: wall mounting and tripod mounting. The front orientation, the cable port facing down, and the metal clearance rule apply equally to both.
Metal objects can interfere with positioning signals. Do not install locators close to metal objects (e.g., shelves, pillars, refrigeration units).
Keep at least 0.5 m between each locator and any metal object.
- Fix the locator to the wall at a recommended height of 3 m (if height is limited by site conditions, minimum 2 m) from the floor with double-sided tape.
- Install vertically so the LED window faces the inside of the positioning area and the cable port faces down.
- Install with the back of the locator (the S/N label side) against the wall.
- When installing at a wall corner, place it as close to the corner as possible.
- For rented spaces, confirm in advance whether the walls may be marked.
- Installs without damaging walls.
- Even when placing on a desk, keep the locator at 2 m or higher.
- Connect power
- Connect USB-C power (5V/3A) to each locator. Secure cables running across the floor with paper tape to prevent tripping and disconnection.
- When power is connected, the two LEDs on the front light up white, then change color as the device boots. There is one LED at the top and one at the bottom: the top LED shows UWB initialization status, and the bottom LED shows boot, network, server connection, and data transmission status. See the image above and tables below for the meaning of each color.
Bottom LED
What you see on-site
- Before hardware registration (Wi-Fi setup): top green, bottom yellow
- A device that had Wi-Fi set up before: the bottom LED blinks purple and light blue alternately (waiting for an IP from the saved Wi-Fi)
- After hardware registration: top green, bottom blue (server connected)
- Whether positioning actually works is confirmed in 8. Verification, after plan placement and cluster setup are complete.
Checklist
Once all items below are confirmed, you can move on to the next step.