# 1. Before You Install

> Site survey, deciding anchor placement, gathering supplies, preparing a floor plan — everything to finish before you carry hardware to the site.

<Info>
  **Where you work —** 🏬 On-site survey + 📋 Document prep (no GeoSpace screen work yet)
</Info>

What eats up the most time on install day is not the hardware, it is **"there is no outlet · there is no floor plan · nobody decided where these go"**.
Finish the preparation on this page before you go on site, and the install is done in half a day.

## 1. Site survey

Measure and record the following with a tape measure or laser distance meter.

| Measurement                                                      | What it is for                                                                                             |
| ---------------------------------------------------------------- | ---------------------------------------------------------------------------------------------------------- |
| **Width · depth** of the detection area (m)                      | Basis for setting the floor plan scale and entering anchor coordinates                                     |
| Ceiling height, or the height you can mount at                   | Determines the anchor mounting height — recommended **2.4 – 3 m** (minimum 2 m)                            |
| One span whose real length you know exactly (wall to wall, etc.) | The two-point reference for [setting the floor plan scale](/en/geospace/spaces#3-configure-the-plan-scale) |

<Tip>
  If your tape measure is too short, mark the floor with tape and measure in sections. **An error of about ± 10 cm is fine** —
  you do not need centimeter precision; recording to the nearest 10 cm is enough.
</Tip>

<Check>
  **Checkpoint —** You are done once you have the numbers written down: "○ m wide × ○ m deep, mounting height ○ m".
</Check>

## 2. Decide anchor placement

Place **at least four** anchors at the **four corners of a rectangle** that surrounds the detection area.

* Clustering them on one side, or placing them close to a straight line, greatly increases position error.
* **Stay away from metal (steel, iron, aluminum)** — the rule is simply **do not mount directly onto** metal shelving, steel columns or refrigeration units. Use an arm's length (about 50 cm) between the anchor and the metal as your rule of thumb.
* For each mounting point, check **where the nearest power outlet is**. Whether the power cable (3 m recommended) reaches decides whether you can actually mount there.

<Check>
  **Checkpoint —** You are done once the floor plan (or a sketch) shows the four anchor spots plus the power route for each one.
</Check>

## 3. What to bring

**All setups**

| Item                                 | Quantity                                                               | Notes                                                                                                                                                                                             |
| ------------------------------------ | ---------------------------------------------------------------------- | ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |
| AN-500 anchors                       | **4 or more**                                                          | Based on a rectangular layout surrounding the detection area                                                                                                                                      |
| Power adapters and cables            | One per anchor                                                         | USB-C · **5V/3A** (an out-of-spec adapter causes failures) · **3 m or longer** recommended — measure the cable in the box now (it must cover the mounting height plus the distance to the outlet) |
| Power strips                         | One per anchor position (wherever there is no outlet right next to it) | The four anchors sit in four separate corners, so a single strip usually does not reach                                                                                                           |
| Tape measure or laser distance meter | 1                                                                      | For the site survey and coordinate measurements                                                                                                                                                   |
| Line tape                            | 1                                                                      | For marking zones on the floor (a high-visibility color)                                                                                                                                          |
| Paper tape                           | 1                                                                      | For securing cables on the floor (prevents tripping)                                                                                                                                              |
| Label paper or masking tape · pen    | 1                                                                      | For writing the last 4 digits of the MAC on the front of each anchor                                                                                                                              |

**Additional items by mounting method** — choose one based on site conditions.

| Method                                             | Additional items                          | Notes                                                                                                          |
| -------------------------------------------------- | ----------------------------------------- | -------------------------------------------------------------------------------------------------------------- |
| **Wall mounting** (default for permanent installs) | Double-sided tape, step ladder (or chair) | Easier to reach the required height — for leased spaces, **confirm in advance whether the wall may be marked** |
| **Tripod stands** (temporary · demo)               | **4** tripods                             | No damage to walls — suitable for short-term installs                                                          |

## 4. Prepare the floor plan

You need a **floor plan image (PNG · JPG)** to upload to GeoSpace.

* It must match the real layout of the space.
* A span whose measured length you know (a wall, a column, etc.) must be identifiable on the plan, otherwise you cannot set the scale.

<Tip>
  **You do not need a real floor plan.** If the store is a simple rectangle, **drawing one rectangle in PowerPoint or Excel and
  saving it as PNG** is enough — four visible walls are all you need to set the scale. Just keep two things in mind while you draw.

  1. **Draw it at the measured width:depth ratio** (for example, 12:7 for a 12 m × 7 m store). If the ratio is off, one wall ends up misaligned with the plan.
  2. **Decide which direction counts as "up" in the store (true north), and draw the plan with that direction at the top.** Mark the entrance and
     write the measured width and depth on the drawing as text. The "bottom-left" corner of this plan becomes the coordinate origin (0, 0) in step 4.
  3. **Fill the image with the room** (no outer margin) and entering coordinates gets simpler — you will not have to add an offset in step 5.
     (If you know a design tool such as Figma, feel free to draw it there.)
</Tip>

## Readiness checklist

| # | Item                                                                                                                                     |
| - | ---------------------------------------------------------------------------------------------------------------------------------------- |
| 1 | Width and depth measurements recorded                                                                                                    |
| 2 | Four anchor positions + power routes decided                                                                                             |
| 3 | Equipment and supplies in hand (table above)                                                                                             |
| 4 | Floor plan image file in hand                                                                                                            |
| 5 | GeoSpace and OneS1ght console account invitations confirmed ([Roadmap · Before you start](/en/roadmap#what-to-prepare-before-you-start)) |

## Next steps

<Card title="Step 2 · GeoSpace setup (account)" icon="arrow-right" href="/en/geospace/onboarding" horizontal>
  Sign in to GeoSpace and confirm your organization and license.
</Card>